cpi
Current Issue Flipbook

Trade Journals for the Concrete Industry

Current Issue Archive Online Flipbooks CPI Middle East CPI TV Events Buyers' Guide Newsletter Advertising Subscription
Suchen

Construction of an undergroundrailway station in Istanbul


Putzmeister Concrete Pumps GmbH, 72631 Aichtal, Germany

 


An MXKD 50 on a 15 m lattice tower and a BSA 2110 HP D stationary concrete pump started work in February 2010 on the Marmaray tunnel section, which is being built using an open construction method. The base area of the excavation is approximately 300 m long and 35 m wide, and was divided into a total of 29 concreting sections for the concreting of the foundations. Each section – approx. 10 x 35 m and 2 m thick – is concreted using a monolithic method. About 120 m3 of concrete are installed in each layer with a thickness of approx. 40 cm. Hence an average of 650 m3 of concrete are installed for each of the 29 foundation sections.

Show article
Download article
 


Contact

Putzmeister Concrete Pumps GmbH
Max-Eyth-Str. 10
72631 Aichtal, Germany
T +49 7127 599613
F +49 7127 599140
www.putzmeister.de
pmw@pmw.de


CPi worldwide journals are trade journals for the concrete and precast concrete industry that are published in 10 different language editions in more than 170 countries. These trade journals, with their practical editorial reporting on research, production and applications, are specifically addressing the decision makers of the concrete and precast concrete industry.

About us
Contact
ad-media GmbH

Industriestrasse 180
50999 Cologne
Germany

T: + 49 2236 96 23 90
F: + 49 2236 96 23 96
info@ad-media.de

Links
  • Magazine
  • CPi-tv
  • Events
  • Buyers' Guide
  • Newsletter
  • Advertising
  • Patents
  • ad-media GmbH
Social
  • Linkedin
RIGHTS
  • Imprint
  • Data Protection