The 2010 soccer world cup in South Africa has played a considerable role in influencing the expansion of the railway network. Amongst other projects, the completion of the Gautrain, an 80 km long high-speed train connection, is being brought forward at a rapid pace. Two Putzmeister concrete pumps and a stationary Putzmeister boom are involved in the production of the numerous large precast components.
Contact
Putzmeister Concrete Pumps GmbH
Max-Eyth-Str. 10
72631 Aichtal, Germany
T +49 7127 5990
F +49 7127 599520
www.gautrain.co.za
www.putzmeister.de
pmw@pmw.de