Slim Floor construction methodwith Deltabeam® composite beams

Peikko Deutschland GmbH, 34513 Waldeck, Germany

The Slim Floor construction method with the binding beam underside slab lev-elled is an economical alternative solution to floor slabs with concrete mixed on site. This method was designed and developed in Scandinavia and com-bines the advantages of steel/composite construction with those of reinforced concrete/reinforced precast construction at lower installation heights without the occurrence of perforation problems.

Subscribe to magazine

Contact

Peikko Deutschland GmbH Brinker Weg 15, 34513 Waldeck, GERMANY T +49 5634 1231, F +49 5634 7572 www.peikko.com info@peikko.de

Events

06.08.2024 - 08.08.2024
14.08.2024 - 16.08.2024
21.08.2024 - 24.08.2024