cpi
Current Issue Flipbook

Trade Journals for the Concrete Industry

Current Issue Archive Online Flipbooks CPI Middle East CPI TV Events Buyers' Guide Newsletter Advertising Subscription
Suchen

The highest standards for the highestbuilding


GPE LLC, Dubai, United Arab Emirates

 


The most challenging requirements which the concrete for the Burj Arab had to meet were that the recipes had to be fine-tuned to the minutest detail, the weighing accuracy had to be as high as possible and the quality had to be absolutely consistent. At a height of more than 700 m, this will be the highest building in the world and therefore another milestone in the unprecedented construction boom which is taking place in the Emirate of Dubai. The contract for supplying the concrete was awarded to Unimix, which is one of the largest ready-mix suppliers in the UAE. Two extra ready-mix concrete plants each with an output of 120 m3 were set up near the construction site.

Show article
Download article
 


Contact

GPE LLC
P.O. Box 182234
Dubai, VAE
T +971 4 2242274
F +971 4 2242276
www.gpe-dubai.com
info@gpe-dubai.com


CPi worldwide journals are trade journals for the concrete and precast concrete industry that are published in 10 different language editions in more than 170 countries. These trade journals, with their practical editorial reporting on research, production and applications, are specifically addressing the decision makers of the concrete and precast concrete industry.

About us
Contact
ad-media GmbH

Industriestrasse 180
50999 Cologne
Germany

T: + 49 2236 96 23 90
F: + 49 2236 96 23 96
info@ad-media.de

Links
  • Magazine
  • CPi-tv
  • Events
  • Buyers' Guide
  • Newsletter
  • Advertising
  • Patents
  • ad-media GmbH
Social
  • Linkedin
RIGHTS
  • Imprint
  • Data Protection