In 2005, the German company BFS delivered and installed a new wet-cast plant for Atlas Paving in Australia. The plant, which is divided into separate lines for wet and dry production sequences, is designed for fully automised manufacture of concrete block and slab paving. To achieve high flexibility in the production process, wet and dry production lines are connected via fork lift traffic.
Contact
BFS – Betonfertigteilsysteme GmbH
Dr.-Georg-Spohn-Str. 31
D - 89129 Blaubeuren, GERMANY
T +49 7344 960314
F +49 7344 4710
v.nusser@sasagrandegroup.com
www.bfs-casagrande.de
RAMPF FORMEN GmbH
Altheimer Str. 1
D – 89604 Allmendingen, GERMANY
T +49 7391 505111
F +49 7391 505187
www.rampf.de
Atlas Group
Alexander Drive, Malaga
Perth, WA, AUSTRALIA
T +61 8 9249 1422
F +61 8 9249 3575
www.atlas-group.com.au
sales@atlas-group.com.au