Since the planned extension of one of the most important German motorways would have placed undue stress on the sewer network underneath, a new robust sewer section almost 50 m long had to be installed. After the foundation had been put in place, the 17 sewer double box culverts were lifted into the large excavation pit by a mobile crane.