Second Generation of Pipe Lifter

MGF Trench Construction Limited, Ashton in Makerfield - Wigan, WN4 8DE, Great Britain

The new high capacity pipe lifter from MGF Trench Construction is the second generation robust mechanical clamping arm designed as an excavator attachment that unloads and installs utilities concrete piping without the need for hydraulic links or additional energy supply.

Subscribe to magazine

Contact

MGF Trench Construction Limited Grant House Lockett Road, Ashton in Makerfield Wigan, WN4 8DE, Great Britain T +44 1942 402700 F +44 1942 402701 enquiries@mgf.ltd.uk www.mgf.ltd.uk

Events

30.03.2025 - 02.04.2025
07.04.2025 - 13.04.2025
08.04.2025 - 11.04.2025