A 55-kilometer test track for self-driving cars will soon be completed in Baden-Württemberg, Germany. Not far from Mercedes-Benz’s site in Sindelfingen, south of Stuttgart, Daimler has invested approximately € 200 million in the testing ground for this promising technology since 2015 While only a small amount of this is going towards the underground infrastructure, high quality standards, nevertheless, have been put in place for the selection of building materials. For example, Perfect state-of-the-art monolithic manholes supplied by Beton Kemmler, a local traditional Swabian company, are being installed for the numerous drains. Beton Kemmler has been manufacturing Perfect manhole bases since the summer of 2017. These manhole bases are produced in a mould and include all the relevant features of modern concrete manhole bases.
Contact
Beton Kemmler GmbH
Tübingen-Hirschau
Rittweg 35, 72070 Tübingen, Germany
T +49 7071 7060
F +49 7071 706170
info@beton-kemmler.de
www.beton-kemmler.de
SCHLÜSSELBAUER TECHNOLOGY GmbH & Co KG
Hörbach 4, 4673 Gaspoltshofen, Austria
T +43 7735 71440
F +43 7735 714456
sbm@sbm.at, www.sbm.at
www.perfectsystem.eu