Efficient mixer drum cleaning

DrumBlaster, Bundamba QLD 4304, Australia

DrumBlaster’s build-up control technology reduces mixer drum build-up by 85%+ in just minutes per day using either fresh or recycled water. DrumBlaster technology uses multiple water jets specifically designed to remove concrete build-up from the mixer drum including both sides of the mixer blades. A typical cycle takes 6 minutes. The concrete build-up is removed on a daily basis while the concrete is still green reducing water consumption, lowering fuel costs and increasing production capacity.

Subscribe to magazine

Contact

DrumBlaster 12 Ashburn Rd Bundamba QLD 4304, Australia T +61 409 554 994 info@drumblaster.net www.drumblaster.net

Events

04.12.2024 - 05.12.2024
04.12.2024 - 06.12.2024