… of the future The Priority Programme 2187 “Adaptive modular construction concepts using production line methods – precise fast construction of the future” starts in January 2020 with a total running time of six years. It is multidisciplinary and was set up in 2018 by the Deutsche Forschungsgemeinschaft (DFG – German Research Foundation). Around 50 researchers from all over Germany are collaborating to build faster, more precisely and with less use of resources using prefabricated modules. The technical areas of structural engineering, production technology, civil engineering informatics and mathematics are represented.
Contact
Ruhr University Bochum
Professorship of Structural Concrete
Building IC, Level 5, Room 5-179
Universitätsstrasse 150
44801 Bochum, Germany
T +49 234 3222700
F +49 234 3214370
www.massivbau.rub.de