cpi
Current Issue Flipbook

Trade Journals for the Concrete Industry

Current Issue Archive Online Flipbooks CPI TV Events Buyers' Guide Newsletter Advertising Subscription
Suchen

Two mixing plants master concrete production at Brenner Base Tunnel


Liebherr-Mischtechnik GmbH, 88427 Bad Schussenried, Germany

 


Construction work on the Brenner Base Tunnel for a railway link between Austria and Italy has been underway since 2008. With a length of 64 km, it will be the longest underground railway link in the world. Construction should be completed by the end of 2027. One of the largest construction phases on the Austrian side is construction lot H51 "Pfons-Brenner". Construction work began there in late autumn 2018. The contract was awarded to a consortium led by Porr Bau GmbH.

Show article
Download article
 


Contact

Liebherr-Mischtechnik GmbH
Im Elchgrund 12, 88427 Bad Schussenried, Germany
T +49 7583 9490, F +49 7583 949395
info.lmt@liebherr.com, www.liebherr.com


CPi worldwide journals are trade journals for the concrete and precast concrete industry that are published in 11 different language editions in more than 170 countries. These trade journals, with their practical editorial reporting on research, production and applications, are specifically addressing the decision makers of the concrete and precast concrete industry.

About us
Contact
ad-media GmbH

Industriestrasse 180
50999 Cologne
Germany

T: + 49 2236 96 23 90
F: + 49 2236 96 23 96
info@ad-media.de

Links
  • Magazine
  • CPi-tv
  • Events
  • Buyers' Guide
  • Newsletter
  • Advertising
  • Patents
  • ad-media GmbH
Social
  • Linkedin
RIGHTS
  • Imprint
  • Data Protection