Lintec & Linnhoff has kicked off production of its asphalt and concrete batching plants at its newest facility, a manufacturing site in the state of Johor, Malaysia. New models for customers are already rolling off the production lines at the plant, which began limited-scale operations in 2021 before ramping up in 2022. The manufacturing facility covers 88,888 sq. ft of space, with two planned future expansions.
Subscribe to magazineContact
Lintec & Linnhoff Holdings Pte Ltd 71 Tech Park Crescent, Singapore 638072 T +65 6863 1111 F +65 6863 3811 info@lintec-linnhoff.com www.lintec-linnhoff.com