cpi
Current Issue Flipbook

Trade Journals for the Concrete Industry

Current Issue Archive Online Flipbooks CPI Middle East CPI TV Events Buyers' Guide Newsletter Advertising Subscription
Suchen

Faster installation of up -turn beams thanks to correspondingaccessories


Max Frank GmbH & Co. KG, 94339 Leiblfing, Germany

 


Upturn beams have prevailed as permanent formwork in semi-finished parts. The prefabricated fibre reinforced concrete elements facilitate the moulding of wall and floor elements in precast factories. Besides the constant quality of fibre reinforced concrete elements, manufac turers also give consideration to simple handling and quick installation on the circulation plants in the precast factory.

Show article
Download article
 


Contact

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing, Germany
T +49 9427 1890
F +49 9427 1588
www.maxfrank.de
info@maxfrank.de


CPi worldwide journals are trade journals for the concrete and precast concrete industry that are published in 10 different language editions in more than 170 countries. These trade journals, with their practical editorial reporting on research, production and applications, are specifically addressing the decision makers of the concrete and precast concrete industry.

About us
Contact
ad-media GmbH

Industriestrasse 180
50999 Cologne
Germany

T: + 49 2236 96 23 90
F: + 49 2236 96 23 96
info@ad-media.de

Links
  • Magazine
  • CPi-tv
  • Events
  • Buyers' Guide
  • Newsletter
  • Advertising
  • Patents
  • ad-media GmbH
Social
  • Linkedin
RIGHTS
  • Imprint
  • Data Protection