Three large PM truck-mounted concrete pumps – with the new M 70-5 leading the way – were on site at the same time recently, as the “Oakland Touchdown”, the eastern approach of the new Bay Bridge in San Francisco Bay, was concreted.
Contact
Putzmeister Concrete Pumps GmbH
Max-Eyth-Str. 10
72631 Aichtal, Germany
T +49 7127 5990 · F +49 7127 599520
www.putzmeister.de
pmw@pmw.de