Wall-to-wall or wall-to-column connections can be manufactured economically in precast concrete construction using the 3D-VS connection. The Pfeifer systems with building authority approval, such as the VS Slim Box, the VS Plus Box and the VS TZ 250 and TZ 100 rail systems, can now absorb and transfer forces from all directions (3D).
Subscribe to magazineContact
Pfeifer Seil- und Hebetechnik GmbH Dr. Karl Lenz Str. 66 87700 Memmingen, Germany T +49 8331 937 290 F +49 8331 937 294 www.pfeifer.de complett@pfeifer.de