Before pumping concrete, water is mixed with cement and sand to form a grout that is send to the system. A hard sponge ball should be placed in the line ahead of the slurry to insure maximum coating of the pipe.
Subscribe to magazineContact
Leyco chemische Leyde GmbH Industriestraße 155 50999 Köln, GERMANY T+ 49 2236 966000 F+ 49 2236 9660010 www.leyde.com Leycochem@leyde.com