Before pumping concrete, water is mixed with cement and sand to form a grout that is send to the system. A hard sponge ball should be placed in the line ahead of the slurry to insure maximum coating of the pipe.
Contact
Leyco chemische Leyde GmbH
Industriestraße 155
50999 Köln, GERMANY
T+ 49 2236 966000
F+ 49 2236 9660010
www.leyde.com
Leycochem@leyde.com