Fresh concrete is generally considered no-slump if it has a slump less than 2 cm and a VeBe time longer than 5 sec. approx. Therefore it consists of a stiff mass that has to be compacted by means of pressure combined with vibration, rolling and/or extrusion, generally a shear movement in order to grant a good interlocking between the aggregate particles. Gyratory Testing Machine well reproduce in laboratory the compaction of noslump concrete by mean of vertical pressure combined with the gyratory movement.
Contact
Controls S.R.L.
6, Via Aosta
20063 Cernusco s/N (Mi), ITALY
T +39 02 921841
F +39 02 92103333
www.controls.it
controls@controls.it