From the cone to the manhole bottom – IDLA click 3punktplus guarantees secure load transmission. To this end, three, six, or nine IDLA click elements are vibrated into the outer contact areas of the manhole elements in the factory. The result is a manhole system for high demands with ‘integrated seal and load transfer’ in the socket (Integrierter Dichtung und Lastübertragung – IDLA) in accordance with the 3punktplus system. The IDLA click load transmission elements can withstand wheel loads of standard HGVs up to 60 tonnes according to DIN 1072 with the requisite margin of safety.
Subscribe to magazineContact
Wagener & Polascheck Vertriebsgesellschaft mbH & Co. KG Anlagentechnik für die Betonfertigteilindustrie Gewerbestrasse 5, 33818 Leopoldshöhe, Germany T +49 5202 98200, F +49 5202 982022 info@wapo-team.de, www.wapo-team.de www.idla-schachtsysteme.com