New finishing line at Tobermore in Northern Ireland

SR-Schindler Maschinen-Anlagentechnik GmbH, 93057 Regensburg, Germany

In late July 2016 Tobermore ordered a finishing line for paving stones and hermetic slabs from SR-Schindler. The plant was delivered in late May 2017 and went into operation in September/October. Tobermore had already purchased a 1200-tonne hermetic press with horizontal depositing device, a shotblasting line and an on-edge packing from SR-Schindler in 2009. At that time the plant had already been designed such that the hardened slabs were placed by the slab transfer device of the dry-side horizontal depositing device onto a roller conveyor with an angular transfer unit. In the first stage of expansion the slabs were then conveyed in a straight line into the shotblasting plant. In the present second stage of expansion the slabs are moved by means of the angular transfer unit diagonally into the new finishing line.

Subscribe to magazine

Contact

SR-Schindler Maschinen-Anlagentechnik GmbH Hofer Straße 24, 93057 Regensburg, Germany T +49 941 696820, F +49 941 6968218 info@sr-schindler.de, www.sr-schindler.de Tobermore Head Office 2 Lisnamuck Road Tobermore Country L'derry, BT45 5QF, UK T +44 28 79642411, F +44 28 79644145 sales@tobermore.co.uk, www.tobermore.co.uk

Events

11.12.2024 - 14.12.2024
13.01.2025 - 18.01.2025
21.01.2025 - 23.01.2025