The construction of the Colorado River Bridge at the Hoover Dam in the USA was a challenge for both man and technology. The open arched bridge was considered to be one of the most technically demanding bridges ever to be built in North America and demanded the entire knowhow of the executive general contractor Obayashi/PSM JV (a joint venture of the Obayashi Corporation and PSM Construction USA).
Subscribe to magazineContact
Putzmeister Concrete Pumps GmbH Max-Eyth-Str. 10 72631 Aichtal, Germany T +49 7127 5990 F +49 7127 599520 www.putzmeister.de pmw@pmw.de